A working kitchen of a dual-kitchen arrangement, walnut and stone

Kitchen renovation · Dubai

The kitchen is where a house is judged.

Ours are made in our own 30,000 sq ft workshop, not ordered from a catalogue and installed by someone else.

DMDC Group is five companies under one owner — design and architecture, contracting, woodworks, estates and project management. More than 1,200 people; over 350 projects delivered since 2021.

Why most kitchen quotations are not comparable.

A kitchen quotation from a contractor is usually three quotations wearing one cover: cabinetry bought from a supplier, appliances specified by a third party, and installation by whoever is available. Nobody in that chain is accountable for how the doors line up a year later.

We manufacture the cabinetry ourselves, in the group’s own thirty-thousand-square-foot workshop in Dubai Industrial City, which is why we can quote the whole kitchen as one price and stand behind it as one piece of work.

What changes when you own the factory.

Timber is selected by the log rather than the sheet, so grain runs continuously across a run of doors. Sizes are made to the room instead of the room being adjusted to standard carcasses. A change made in week six is a change on the shop floor, not a reorder with a twelve-week lead time.

And when something needs correcting after handover, it is corrected by the people who made it.
See the workshop
.
What the work covers

A kitchen renovation is rarely only a kitchen.

The room usually sits at the centre of the house, so the work reaches further than the cabinetry.

Cabinetry & joinery

Made in our workshop to the room’s dimensions — carcasses, doors, drawers, pantry, island and any adjoining millwork, in one grain sequence.

Services

Power, water, drainage and extraction rerouted where the plan changes. In a first-generation villa this is usually the part that determines the programme.

Stone & surfaces

Slab selected with you rather than specified from a sample, and templated on site so veining lands where you want it.

Light

Planned as task, ambient and display, and wired before the ceiling closes — the one element that cannot be added afterwards without damage.

Appliances

Specified to how you actually cook and coordinated with the cabinetry so nothing is fitted around a late arrival.

Questions we are asked

Frequently asked questions

How much does a kitchen renovation cost in Dubai?

The carcass material, the stone, the appliances and the size of the island move the number more than anything else. Because we manufacture rather than order, we can price the whole kitchen as one figure and hold it — rather than three quotations that shift independently.

How long does a kitchen renovation take?

Less than a contractor who orders cabinetry, because a change in week six is a change on our shop floor rather than a reorder with a twelve-week lead time. Services and stone templating set the rest of the programme.

Do you make the kitchens yourselves?

Yes — in the group’s own workshop. Timber is selected by the log rather than the sheet, so grain runs continuously across a run of doors, and the people who made it are the people who install it.
See the workshop
.

Can you match an existing kitchen or design?

Usually. Matching timber and finish is a question of selection rather than ordering, which is the advantage of holding manufacture in-house. Bring a photograph and we will tell you plainly whether it can be matched.

Can we visit the workshop before committing?

Yes, and we would prefer it. Seeing the working floor — not a showroom — is a formal step in
how we work
, before any contract is signed.
The work, seen

The next step

One room, made rather than ordered.

Bring the room and how you cook in it. You will meet the workshop before you commit to anything.

Begin a private brief
info@dmdc.ae 800 129 WhatsApp ↗